With the unique maneuverability of our Goldhofer PST-SLE, a self-propelled modular trailer, Northwest was able to transport this 150,000 lb transformer into site and allowed our Liebherr LTM 1300-6.2 to safely set it in place.
By allowing us to utilize both of these pieces of equipment, our customer not only saved themselves time but also had the satisfaction of knowing it would be done as safely and on time.






