Northwest Uses the LR1600 To Lift Demethanizer
Northwest Picks a 911 Tower in Kansas
Detaching Aircrafts at the 45th Inf. Division Museum
AC Unit Set for Newly Contructed Movie Theatre
Gas Compressor Set in Geary
Transformer Set in Hobart
Northwest Sets School's Air Conditioner
Choctaw Water Tower Erection
Wind Turbine Generator Replacement
Wind Turbine Maintenance in New Mexico
24,000lbs Movie Screen Set in Shattuck,OK
Shawnee Rail Yard Gets Lift
Northwest Sets Platforms for OKC Zoo
Northwest Disassembles Tower Crane
City Mission Rescue Gets a New Air Unit
70,000lb Cellular Structure on Mountain Top Location
New Rock Crusher Erection
Cana 1 Gas Plant Construction Liebherr LR 1400 Narrow Track with Derrick and Ballast Tray and Liebherr LTM1400-7.1
50,000lb Precast Concrete Building Erection
110,000lb Bridge Beam Set
Leedy Gas Plant Construction
LR 1400/2-W Narrow Track Erecting 66 Wind Turbines on Ridge Line
Hoisting American Flag for Former President Bush's Address
LR 1600/2 on site in Portland, OR
254,000lb Gas Compressor Set
Cyclotron Particle Accelerator
VFW Tank and Anti-Aircraft Gun
Compressor Job with New Gantry Crane System
Wind Farm Maintenance
Personnel Carrier Dell City VFW Memorial
Liebherr LR1400/2-W Completes First Job In U.S.
Shallow Water Source Vessel
LR1400/2-W erects Suzlon S88 Turbines first time in U.S
Northwest Crane's Liebherr LR1600/2 on site in Portland, OR
Rotor and Gearbox replacements near Guymon, OK
Northwest's LTM 1400 7.1 setting a 115,000lbs Catalyst Tray
Northwest's LTM 1200 Picks a 400,000lb Locomotive
Northwest's Liebherr LTM 1200 Rerails Five Railcars Near Okeene, OK
Erecting a 500,000 Gallon Water Tower In Stillwater, OK
Bridge Deck Dismantle Over Live Traffic on I-44 Turnpike