Northwest Crane Service operator Colby Milward has completed the erection of the 12 turbines on site in Manchester, New Hampshire this is the first job the Liebherr LR1400/2-W has completed in North America. this is also the first Wind Farm erected in New Hampshire.The Mechanical Completion Contractor on site, Walbridge Equipment Installation's Chief Estimator, James Seagram, said this about Northwest, " I wanted you to know it was a pleasure working with you and your team at our Lempster project. We appreciate the professionalism your group brought to the project." The job site was located on mountainous terrain and was designed for a Narrow Track Crane. Due to the mountainous terrain the roads were constructed to a width of 22ft. The narrow 15ft 9in travel track width of the LR1400-2/W was ideal for the narrow roads on the Lempster, NH site. In addition to the narrow width the outrigger design of the LR1400-2/W dose not require the installation of crane matting to erect the wind turbines. Both the narrow track and outrigger designs significantly reduce the cost, erection time, and environmental impact of the construction site. Contact us to inquire about the Liebherr LR1400-2/W for your project.