110,000lb Bridge Beam Set

Northwest Crane Service utilized their Liebher LTM 1100-4.1 and Liebherr LTM 1220-5.1 to set the beams for three bridges in between Canadian, Texas and Perryton, Texas. Northwest team members Lee Wade, Garen Oakley, Travis Vowell, Jeff Rice, Bill Thompson, and Jeremy Green rigged the cranes up with full counterweight to set the 110,000lb beams at a 40ft radius. The experienced crews and highly mobile equipment were able to rig the cranes up/down and set the beams for all three bridges in a two days time.