Leedy Gas Plant

Northwest's LTM1400 and LTM1200 set two 110ft long vessels that weighed 140,000lbs and a 120ft tall 108,000lbs Demethanizing tower at a gas plant near Leedy, Oklahoma.  Rolling Snatch Block rigging was utilized to rotate the vessels 90 degrees to their setting position. The high manuverability of the LTM1400 and LTM1200 allowed the Northwest team members to get the cranes into position to set the Demethanizing tower on a very space limited location.