Northwest Crane team members Justin Pace, Chris Tymchuk, Kaleb Hursh, Winston Noah, and Greg White were on site to dismantle an out of date bridge over the I-44 turnpike near Chandler, OK. The team rigged up Northwest's LTM 1220 - 5.1 with 167,100 lbs of full counterweight to take down the 95,000lb bridge sections. The Northwest team utilized rolling road blocks and a 22ft spreader beam to bring down the deck sections over live lanes of traffic. The Liebherr LTM 1220 - 5.1 was rigged up at a 45ft radius.The job was done at night in order to lower the traffic load under the crane.